{"meta":{"title":"DHA Capture Intelligence Graph (fallback)","graph_file":null,"error":"Missing or invalid JSON at /opt/render/project/asrc_capture/data/DHA/Vendor Day/processed/dha_graph.json","sources":["Set ASRC_CAPTURE_ROOT or place dha_graph.json under Vendor Day/processed/"],"pipeline_file":"/opt/render/project/src/data/inputs/dha_pipeline.json","strategy_file":"/opt/render/project/src/data/inputs/dha_strategy.json","pipeline_summary":{"total_opportunities":18,"go_count":2,"kill_count":1,"selective_count":14,"sub_count":1,"other_count":0,"top_targets":[{"id":"dmix_diss","name":"DMIX / DISS / Data Exchange","pwin":0.85,"recommendation":"GO"},{"id":"gsp_to13_walter_reed","name":"GSP TO #13 (Walter Reed)","pwin":0.75,"recommendation":"GO"},{"id":"workforce_3","name":"Workforce 3.0","pwin":0.55,"recommendation":"SELECTIVE"}]},"strategy":{"strategic_key":"Evidence-backed integration and governance — compete where modular breakpoints and transition risk create a credible ASRC wedge, not where iron-triangle primes own the narrative.","core_thesis":"DHA is stress-testing multi-contract vs system integrator models while cloud/OCI and SPI continuity drive transition risk. ASRC wins by owning integration seams, data exchange credibility, and disciplined teaming — not by generic PMO volume.","win_strategy":["Anchor bids on proven interoperability / DMIX-adjacent delivery and Rhapsody–Med-COI complexity where ASRC differentiation is defensible.","Map each opportunity to incumbent, SI posture, and modular breakpoint (purple) before committing B&P; use the graph as the pre-brief spine.","Pursue prime only where PWin and vehicle fit support it; use SUB/SELECTIVE lanes to build past performance without over-teaming.","Tie capture narrative to Vendor Day Q&A and contract-strategy signals (FPDS / USAspending) so leadership sees traceable evidence."],"risks":["Unresolved SI authority — scope and interfaces can shift late, eroding a narrow integration story.","Leidos / large integrator incumbency on GENESIS-scale vehicles limits prime paths without differentiated scope.","Cloud/OCI migration timing can compress transition windows and spike performance risk.","Over-bidding thin signals (low FPDS activity) burns B&P and dilutes focus from high-confidence targets."]},"notes":["pipeline_match: pipeline:dmix_diss: no graph node match","pipeline_match: pipeline:gsp_to13_walter_reed: no graph node match","pipeline_match: pipeline:workforce_3: no graph node match","pipeline_match: pipeline:dencom_cds2: no graph node match","pipeline_match: pipeline:hcds_genesis: no graph node match","pipeline_match: pipeline:sync_md: no graph node match","pipeline_match: pipeline:care_coord_ebms: no graph node match","pipeline_match: pipeline:midas_engineering: no graph node match","pipeline_match: pipeline:usammda_command: no graph node match","pipeline_match: pipeline:lan_wlan_modernization: no graph node match","pipeline_match: pipeline:clinical_ksa: no graph node match","pipeline_match: pipeline:peo_dhms_ess_next: no graph node match"]},"nodes":[{"id":"MISSING_JSON","type":"document","label":"dha_graph.json not found","detail":"Copy or generate processed/dha_graph.json under asrc_capture Vendor Day folder.","source_ref":"/opt/render/project/asrc_capture/data/DHA/Vendor Day/processed/dha_graph.json","highlight":"transition_risk"}],"edges":[]}